Thematic Investment Deduction : Applications for energy investments now open in Wallonia

Mathilde RaymakersInnovation and Sustainabilty Consultant

Since 22 October 2026, companies can submit applications via the Walloon “Mon Espace” platform for attestations relating to energy-efficiency and renewable-energy investments made in 2025 and 2026. Wallonia has thus joined Flanders, where applications are already being handled by VEKA. This is a welcome step forward, but it does not mean that attestations can yet be issued. Several precautions therefore remain essential to safeguard the tax benefit.

An attractive tax deduction that requires an attestation

The reform introduced by the Law of 12 May 2024 replaced the previous system with three types of investment deduction: the basic deduction, the technology deduction and the thematic deduction. The latter allows companies to deduct 40% of the investment value from their taxable profits. For investments made from 2026 onwards (assessment year 2027), this rate applies to all companies.

The energy component covers certain investments designed to reduce energy losses, recover heat, electrify industrial processes, store energy or generate renewable energy. Each investment must fall within a category on the official list and meet all applicable technical and tax requirements.

The key requirement is an attestation issued by the Region in which the investment is made, rather than the Region where the company has its registered office. However, the procedure for issuing these attestations depends on a cooperation agreement between the federal government and the Regions that has still not been published. As a result, companies have been investing since 2025 without being able to obtain their attestations.

Wallonia and Flanders: Applications for energy investments are now possible

Since 22 October 2026, companies in Wallonia have been able to submit online applications through Mon Espace for attestations covering energy investments made in 2025 and 2026. They can also apply for an investment certificate where a project extends over several tax periods. Wallonia has therefore joined Flanders, where VEKA (the Flemish Energy and Climate Agency) has been accepting applications for energy investments since spring 2026.

These procedures are not yet available for every component of the thematic deduction. In both Wallonia and Flanders, applications for attestations and certificates relating to environmental investments cannot yet be submitted. The relevant forms will only become available once the required cooperation framework has been adopted. Companies concerned should nevertheless start preparing their supporting files now, including invoices, technical data sheets, explanatory notes and calculations demonstrating eligibility for the deduction.

Submitting an application does not yet confer entitlement to the deduction

One significant limitation remains: energy-related attestations cannot be issued until the cooperation agreements have been published in the Belgian Official Gazette. Submitting an application allows a company to prepare and register its file, but does not guarantee either the issue of an attestation or final entitlement to the tax deduction.

A transitional measure nevertheless provides protection for taxpayers in respect of investments acquired or created between 1 January 2025 and 31 December 2026. If an attestation is not yet available when the tax return is filed, the deduction may still be claimed, provided the company keeps all documents establishing the investment’s eligibility available for inspection by the tax authorities.

This transitional measure does not remove the obligation to obtain the attestation at a later stage. The company must be able to produce it in the event of a tax audit. Otherwise, the deduction claimed may be disallowed. Companies are therefore advised to submit their applications without delay and maintain a well-documented file containing, as applicable, invoices, technical data sheets, a project description and financial calculations.

Payback period, IRR and investment certificates: New requirements to anticipate

Eligibility also depends on the investment’s own financial return. For a small company, the simple payback period must be at least three years. For a company that does not qualify as small, this requirement is supplemented by an internal rate of return (IRR) of no more than 13%.

A new calculation template for the payback period and IRR is expected to document these figures. The underlying assumptions, particularly the amount invested, operating costs and expected savings, must be supported by evidence. Consistency between these calculations, the energy study and the project’s technical specifications is therefore a key element of the application.

Where a project extends over several financial years, the company may also apply for an investment certificate. This establishes the list of investments and the criteria against which the project’s future investments will be assessed. However, it does not replace the annual attestation, which remains necessary for each period in which investments are made.

Finally, where insufficient taxable profits prevent the deduction from being used in full, the unused balance may, in principle, be carried forward indefinitely.

Prepare applications now and safeguard the tax benefit

The opening of Mon Espace marks a long-awaited step forward for companies that have invested in energy efficiency or renewable energy. It does not, however, resolve every uncertainty: attestations still depend on the publication of the cooperation agreements, and each application must meet precise technical requirements.

ABV Development helps companies identify eligible investments, calculate payback periods and IRR, compile supporting evidence and submit their applications. An initial assessment also helps safeguard the tax treatment of the deduction while companies await their final attestations.

Contact our teams to review your situation.

Our multidisciplinary team analyses your situation and proposes support tailored to your technical, regulatory and scheduling challenges.